Lake Forest Project Set for March Finish
- Share via
Completion is scheduled for March on the $5-million, three-story, 50,000-square-foot Lake Forest Executive Center under construction at the San Diego Freeway and Lake Forest Drive in the Orange County community of Lake Forest.
The project has a two-story atrium lobby and 17,000 square feet on each floor, with space available ranging from 900 square feet to a full floor, according to a spokesman for the developer, Pacesetter Business Properties, the commercial/industrial counterpart of Pacesetter Homes Inc., Newport Beach.
Koll Project Started The $10-million Prospect Point office and retail center is under construction at Prospect and Cave streets in La Jolla. Koll Construction Co. is building the 30,000-square-foot, three-story building for Dalen-Enz & Associates and SEG America. A spring completion is projected for the “post-modern Mediterranean” project designed by Martinez Wong & Associates, with architect Robert Stern Consulting. Working drawings and construction administration are by Wheeler-Wimer Architects.
Ventura Project Sold Ventura Professional Center, a 100,000-square-foot, three-building office center at 5700 Ralston St., Ventura, has been sold for a price in excess of $9.9 million by Eastern Global Corp. of Los Angeles to August Financial. Cushman & Wakefield’s downtown Los Angeles office represented both parties in the transaction.
Miramar Offices Set Nearing completion is the Miralani Corporate Center, an $8-million, three-building development under construction at 8665-8685 Miralani Drive in the East Miramar Road area of San Diego. The 75,000-square-foot center was designed by Bruce Steingraber for Beaty Development Co. Iliff, Thorn & Co. is the leasing agent.
More to Read
Sign up for Essential California
The most important California stories and recommendations in your inbox every morning.
You may occasionally receive promotional content from the Los Angeles Times.