Addition Started on Hughes Labs Malibu Facility
- Share via
A late-1987 completion is scheduled for a $20-million addition to the Hughes Aircraft Co. Research Laboratories in Malibu.
Designed and engineered by Albert C. Martin & Associates, with HuntCor Inc. as construction manager, the 90,000-square-foot project consists of three levels plus a basement terraced into the hillside above Malibu Canyon Road.
The addition includes offices, a clean room and a laboratory building and will be adjacent to the existing facilities. Also included is a 168-seat auditorium for seminars and meetings.
The addition has been designed so that it matches the height of the existing structure and cascades down the hilly terrain.
More to Read
Inside the business of entertainment
The Wide Shot brings you news, analysis and insights on everything from streaming wars to production — and what it all means for the future.
You may occasionally receive promotional content from the Los Angeles Times.